Traverse Engineering
PRODUCT · TRI™

Make fiber routes engineering-ready before design begins.

TRI™ Route Intelligence is an advisory validation report. It scores route risk, exposes hidden assumptions, and shows where field verification matters most—so span, ROW, and crossing problems surface before the engineering clock starts.

  • Advisory validation, not stamped engineering
  • Fixed-price tiers from $3,500
  • KML / KMZ / GeoJSON in → PDF + KMZ out

Deliverables

What you get with a TRI Report

TRI Score

Overall and category readiness (span, structure, ROW, crossings, constructability), rated Green / Yellow / Red.

Assumptions Ledger

An explicit list of what the route depends on, and how confident each assumption is.

Risk-Flagged KMZ

A map file showing segment by segment where the engineering risk is concentrated.

Engineering Next Actions

A prioritized verification checklist: what to confirm first and where to focus field effort.

Know what TRI is (and isn't)

Validation before design. No scope creep.

TRI strengthens feasibility and early design decisions. It validates route assumptions and highlights constructability risk before budgets, scopes, and grant narratives are locked.

Not a feasibility studyIt supports your feasibility team. It doesn't replace them.
Not stamped engineeringAdvisory assessment only. No seal, no design instructions.
Not field verificationIt tells you where to verify, not that verification is done.

Process

How TRI works

AI-assisted analysis with human review of every flagged segment.

  1. Submit your route

    KML / KMZ / GeoJSON, or a corridor description, plus known constraints and deadlines.

  2. Route risk analysis

    Geometry, span assumptions, crossings, ROW indicators, and constructability are scored by segment.

  3. Human review

    High-risk segments are reviewed, scores sanity-checked, and recommendations refined.

  4. Deliver TRI artifacts

    A client-ready PDF and a risk-flagged KMZ, ready for your engineering team.

Advisory notice: TRI supports planning and risk mitigation. It does not replace field verification, make-ready, permitting approvals, or stamped engineering.

Pricing

Fixed-price TRI tiers

Pick the depth that matches your route's stage and risk. Turnaround is counted from receipt of complete route inputs.

TRI Lite
$3,500

Typical turnaround: 3–5 days

Early screening and corridor comparison.

  • Overall TRI Score
  • Top risk flags
  • Assumptions summary
  • Basic KMZ export
Request Lite →
TRI Pro
$18,500

Typical turnaround: 7–10 days

For data center campuses, grant-funded, or high-risk corridors.

  • Everything in Standard
  • Multi-route / scenario comparison
  • Priority human review of flagged segments
  • Engineering handoff notes
  • Review call with the principal
Request Pro →

Need multiple corridors or a rush timeline? Mention it in your request.

FAQ

Is TRI a feasibility study?

No. TRI is a pre-engineering validation report. It supports feasibility by identifying route risk, listing assumptions, and flagging the segments most likely to drive redesigns or change orders.

Is this stamped engineering?

No. TRI is advisory only and is not sealed by a licensed Professional Engineer. It does not replace field verification, make-ready, permitting approvals, or professional engineering review.

When should we run TRI?

Ideally before feasibility is finalized, to validate assumptions, and again before engineering starts. Most teams run TRI once per route concept.

What inputs do you need?

KML, KMZ, or GeoJSON is ideal. If you don't have that yet, send a corridor description and we'll walk you through intake.

How is AI used?

AI-assisted analysis screens the route and scores segments. A human reviews the flagged segments and the final recommendations before anything is delivered.

Request TRI

Request a TRI™ Report

Tell us about your route. We'll confirm scope, tier, and timing by email before any work begins. Advisory, not stamped engineering.

Intake checklist

  • Route file: KMZ / KML / GeoJSON (preferred), or a corridor description
  • Build type: aerial / underground / mixed (if known)
  • Known crossings, constraints, priorities, and deadlines

Prefer email or phone?

travis.canfield@att.net
(706) 399-5855

TRI supports feasibility by validating assumptions and constructability risk. It is not a feasibility study.

Submit your request

Fields marked with an asterisk are required.

Don't have a link? Mention it in the notes and we'll reply with a secure way to send the file.

Advisory notice: TRI is not stamped engineering and does not replace field verification or permitting approvals.